How to equip gas heating in an apartment


Checklist of required actions

If it became known that the installation of individual heating is allowed in the house, a long walk through the authorities cannot be avoided:

  • First of all, you need to go to the local organization responsible for the supply of gas and write a statement there regarding the installation of a gas boiler in the apartment. After a certain time, the homeowner is issued an opinion regarding the permission or prohibition for the installation of the heating unit. If you receive a positive answer, you can install the hardware.
  • Next, you need a project. It should be ordered from a design office authorized for this type of work. Its address can be obtained from the gas supply company. At this stage, it is advisable to choose a boiler model and a counter. Design documentation should be drawn up for them, and the data should be indicated in the specification. The fact is that after approval changes can be made only later, and for a separate fee. If the project is signed, nothing can be changed in it, you need to order a new one.
  • In the fire authorities, you should find out the address and name of the organization that checks the condition of the ventilation ducts and agree with its specialists about the service. A company representative will come and check the quality of ventilation. If everything is in order, permission will be issued to install a gas boiler in the apartment. In the event of an unsatisfactory condition of the chimney, an act is drawn up with a list of works to be performed. After eliminating the shortcomings, you need to re-invite a specialist in order to eventually get permission.
  • At the next stage, an application for refusal of heating is submitted to the heating network. If you plan to heat the water yourself, you also need to refuse hot water supply. It is advisable to immediately clarify the timing of the shutdown measures. The rework project approved by Gorgaz should already be on hand.

gas boiler in the apartment instead of central heating

  • Data on the purchased meter and boiler are reported to the project organization. Then the finished documentation is taken away. It is not worth purchasing equipment in advance, since permission to install a gas boiler in an apartment building cannot always be obtained.
  • Then, in the Gorgaz department, an agreement is concluded for the maintenance of the unit, and the gasification project is submitted for approval.
  • After receiving the signed project in your hands, you can start disconnecting from the heating network. In this case, you will need to drain the water from the heating system of the whole house.
  • Further, the owner of the apartment must mount an individual heating system. The boiler is installed without connecting to the gas main, the system is checked for tightness and readiness for operation.
  • In "Gorgaz" they find out the date when it is possible to install a gas boiler in an apartment building in a specific apartment. Its employees will connect pipes and equipment according to the project, seal the meter, start up the stove and the unit.
  • In order for the guarantee for the gas boiler to be valid, adjustment and implementation of the first start-up will be required, followed by a mark in the passport. For this type of work, contact the department where the device was delivered for service. The master will adjust the boiler, start the system and put a stamp in the passport. Now you can use the mounted equipment.

The entire process described above, in compliance with the requirements for installing a gas boiler in an apartment building, will take from 1.5 to 2.5 months. Therefore, it is advisable to start the procedure in the spring or at the very beginning of summer.

Rules for installing gas appliances in an apartment

The least problems with the arrangement of individual heating arise among the owners of new apartments that are not connected to a centralized heating system. In this case, there is no need to visit the heating network and there is no need to disconnect from the risers, and the permission to install gas heating in an apartment building may be in the package of documents for real estate.

But in this case, you need to adhere to certain rules. First of all, having documents on hand, you cannot install gas equipment yourself - this work must be performed by specialists. These can be not only employees of a gas supplying organization, but also representatives of a company with which this type of activity is licensed.

installation of a boiler in an apartment building

After completion of the installation, the engineer of the company supplying gaseous fuel will check the correctness of the connection and issue a permit to use the boiler. Only then can the valve leading to the apartment be opened.

Before starting, in accordance with the requirements for installing a boiler in an apartment building, an individual heat supply system must be checked. To do this, it is launched under a pressure of at least 1.8 atmospheres. This parameter can be monitored using the heating unit pressure gauge.

If the pipes are built into the floor or walls, it is advisable to increase the pressure and drive the coolant through them for at least 24 hours. Only after testing the system can you be sure that there are no leaks and that the connections are secure.

The equipment must be vented prior to starting. Since when installing a gas boiler in an apartment building, the systems are made closed, you need to use the Mayevsky taps available on the radiators. Air is released in each battery, bypassing them several times in turn until there is no air in them. The system can then be started up in operating mode - turn on the heat supply.

gas boiler in an apartment building

It should not be forgotten that modern units are controlled by automation, and such devices are demanding on voltage. Therefore, it is recommended to use a voltage stabilizer and an uninterruptible power supply. To protect the boiler from deposits accumulating on its inner surface, filters must be installed at the fuel and cold water inlets.

An electrical outlet and other gas appliance should be placed at a distance of at least 30 centimeters from the unit.

Installing a gas boiler in an apartment

The main stages of the installation approval:

Technical conditions

To connect an apartment or a private house to the city gas supply, it is necessary to obtain technical specifications from the relevant gas service of the city or district. To obtain a technical specification, you need to write a statement, be sure to indicate in it the estimated volume of gas consumption per hour. It will take about 1-2 weeks to complete this document. After the application is satisfied, a technical condition for the installation of gas equipment is issued. This document is an official permit for this type of work.

Installation project

The next stage is the development of a project for the installation of gas equipment. The Gas Supply project is a scheme for installing a gas boiler, as well as a scheme for laying a gas pipeline from the connection point in an apartment to city gas utilities, and, in the case of a connection in the private sector, also a diagram for conducting gas communications along the site with a designation of the entry point to the residential building.

Coordination with regulatory authorities

The Gas Supply project must be approved by Gorgaz or another state controlling organization. Depending on the complexity of the project, its approval can take from 1 week to 3 months.

In addition to the Gas Supply project, the inspection must be provided with:

  • technical passport of the boiler you have chosen;
  • instructions for its operation;
  • certificates (sanitary and hygienic, compliance with technical requirements);
  • expert conclusions on the compliance of this boiler with all the necessary requirements.

This list of documents must be provided by the boiler manufacturer.

If the project has not passed the review, in addition to the official document indicating the reasons for the refusal, you should get your hands on a list of edits to adjust the project.

If the project is executed accordingly, it is certified with a seal.

Arrangement of a room for a boiler

It is best to install a wall-mounted gas appliance in a kitchen, the layout of which meets the standards for the placement of such equipment. Also in this room there is already a supply of both water and gas.

installation of a gas boiler in an apartment building

This is how the norms for installing a gas boiler in an apartment look like:

  1. The area of ​​the room where the installation of equipment is planned, when the ceilings in it are not lower than 2.5 meters, should exceed four square meters.
  2. It is mandatory to have a window that opens. Its area should be 0.3 square meters. m. for 10 cubic meters of volume. For example, the dimensions of the room are 3x3 meters with a ceiling height of 2.5 meters. The volume will be 3x3 x2.5 = 22.5 m3. This means that the area near the window cannot be less than 22.5: 10 x 0.3 = 0.675 sq. m. This parameter for a standard window 1.2x0.8 = 0.96 sq. m. It will do, but the presence of a transom or a window is required.
  3. The width of the front door cannot be less than 80 centimeters.
  4. There should be ceiling vents.

Installation of gas appliances SNiP


We have all known for a long time that the installation of gas appliances, boilers, must be carried out by specialists who have certificates, approvals from gas enterprises!
Our article is offered to help you carry out the correct installation. household gas equipment in compliance with all norms, rules and standards.

To carry out such work, you need to have not only the appropriate tools, but also knowledge of the technology of installation of gas boiler equipment.

Installation work can be started only after receiving the following documents:

♦ technical conditions for connecting an apartment, a house to the gas supply system.

♦ installation project, necessarily agreed in the gas service.

Extract from the State Register of SNiP 2016:

In accordance with SP 42-101-2003 premises intended for installation of gas-using equipmentmust meet the requirements SNiP 42-01 and other regulatory documents. In the room where it is installed gas heating equipment, it is allowed to use window openings as easily resettable enclosing structures, the glazing of which must be fulfilled from the condition: the area of ​​a separate glass must be at least 0.8 m2 with a glass thickness of 3 mm, 1.0 m2 at - 4 mm and 1.5 m2 at - 5 mm. Recommended for rooms intended for installation of heating gas-using equipment, observe the following conditions: ♦ height not less than 2.5 m (2 m - with equipment power less than 60 kW); ♦ natural ventilation (exhaust in the volume of 3 times air exchange per hour; inflow in the volume of the exhaust and additional air for gas combustion).

For equipment power over 60 kW the dimensions of the exhaust and supply devices are determined by calculation; → window openings with a glazing area at the rate of 0.03 m2 per 1 m3 of the room volume and structures fencing from adjacent rooms with a fire resistance limit of at least REI 45 and exit directly to the outside.

For the premises of the basement and basement floors of single-family and blocked residential buildings when installing equipment with a capacity of more than 150 kW in accordance with the requirements MDS 41-2.2000. SNiP 42-01 says that to select a room for installing a boiler, you must be guided by the relevant SNiP. • clause 7.1 Accommodation possibility gas-using equipment in the premises of buildings for various purposes and the requirements for these premises are established by the relevant building codes and regulations for the design and construction of buildings, taking into account the requirements of standards and other documents for the supply of the specified equipment, as well as data from factory passports and instructions that determine the scope and conditions of its use. Thus, when designing a gas boiler in a single-family or blocked residential building, when choosing a room for installing a gas boiler, you must be guided by SNiP 31-02-2001 "Residential single-family houses", in a multi-apartment SNiP 2.08.01 Residential buildings. SNiP 31-02-2001 "Single-family residential houses" says the following: • clause 6.14 In the absence of centralized heat supply, automated heat generators of full factory readiness should be used as sources of heat energy operating on gas or liquid fuel. These heat generators should be installed in a ventilated area of ​​the house on the first or basement floor, in the basement or on the roof. Generators with thermal power up to 35 kW can be installed in the kitchen. The room in which the heat generator operating on gas or liquid fuel is located must have a window with an area of ​​at least 0.03 m2 per 1 m3 of the room. The gas pipeline should be entered directly into the kitchen or into the room for placing the heat generator. The internal gas pipeline in the house must meet the requirements for low pressure gas pipelines according to SNiP 2.04.08. In the absence of a centralized gas supply for supply gas cookers application is allowed gas cylinder installationsplaced outside the home. Inside the house, it is allowed to install a cylinder with a capacity of not more than 50 liters. (Amendment of May 26, 2004). • clause 6.15 Heat generators, including stoves and fireplaces for solid fuels, hobs and chimneys must be carried out with the implementation of constructive measures to ensure the fire safety of the house in accordance with the requirements SNiP 41-01-2003... Prefabricated heat generators and hobs must also be installed taking into account the safety requirements contained in the manufacturer's instructions. MDS 41.2-2000 makes the following requirements for planning and design solutions: The placement of heating units is provided for: ♦ in the kitchen with the power of the heating unit for heating up to 60 kW inclusive, regardless of the presence of a gas stove and a gas water heater; ♦ in a separate room on any floor (including in the basement or basement) with a total capacity for heating and hot water supply systems up to 150 kW inclusive; ♦ in a separate room of the first, basement or basement floor, as well as in a room attached to a residential building, with their total capacity for the heating and hot water supply system up to 350 kW inclusive.

When placed in the kitchen gas stove, instantaneous water heater for hot water supply and a heating unit for heating with a capacity of up to 60 kW, the kitchen room must meet the following requirements: ♦ height not less than 2.5 m; ♦ the volume of the room is not less than 15 m3 plus 0.2 m3 per 1 kW of power of the heating unit for heating; ♦ ventilation must be provided in the kitchen (an exhaust hood in the amount of 3 times the room air exchange per hour, an inflow in the exhaust volume plus the amount of air for gas combustion); ♦ the kitchen must have a window with a window.

For air flow, a grill or a gap with a free cross-section of at least 0.025 m2 should be provided at the bottom of the door.

When placing heating units with a total capacity of up to 150 kW in a separate room located on any floor of a residential building, the room must meet the following requirements: ♦ height not less than 2.5 m; ♦ the volume and area of ​​the premises are designed based on the conditions for convenient maintenance of heating units and auxiliary equipment, but not less than 15 m3; ♦ the room must be separated from the adjacent rooms by enclosing walls with a fire resistance limit of 0.75 hours, and the fire propagation limit along the structure is zero; ♦ natural lighting - at the rate of 0.03 m2 glazing per 1 m3 of the room volume; ♦ ventilation must be provided in the room (exhaust in the amount of 3 times the room air exchange per hour, inflow in the exhaust volume plus the amount of air for gas combustion);

When placing heating units with a total capacity of up to 350 kW in a separate room on the first floor, in the basement or basement of a residential building, the room must meet the following requirements: ♦ height not less than 2.5 m; ♦ the room must be separated from the adjacent rooms by enclosing walls with a fire resistance limit of 0.75 hours, and the fire propagation limit along the structure is zero; ♦ natural lighting (glazing 0.03 m2 per 1 m3 of room volume); ♦ ventilation must be provided in the room (exhaust in the amount of 3 times the room air exchange per hour, inflow in the exhaust volume plus the amount of air for gas combustion); ♦ the volume and area of ​​the premises are designed based on the conditions for convenient maintenance of heating units and auxiliary equipment.

When placing heating units with a total thermal power of up to 350 kW in an extension to residential buildings, the extension room must meet the following requirements: ♦ The extension must be located at a blank part of the building wall with a horizontal distance from window and door openings of at least 1 m; ♦ the wall of the extension must not be connected to the wall of a residential building; ♦ the enclosing walls and structures of the extension must have a fire resistance limit of 0.75 hours, and the limit of fire propagation along the structure is zero; ♦ height not less than 2.5 m; ♦ the volume and area of ​​the room are designed based on the conditions for convenient maintenance of heat generators and auxiliary equipment; ♦ natural lighting (glazing 0.03 m2 per 1 m3 of room volume); ♦ ventilation must be provided in the room (exhaust in the amount of 3 times the room air exchange per hour, inflow in the exhaust volume plus the amount of air for gas combustion). When placing heat generators in a separate room on the first, basement or basement floor, it must have an exit directly to the outside. It is allowed to provide for a second exit to the utility room, while the door must be type 3 fireproof.

Recommendations for the installation of gas equipment

In the documents attached to the product, each manufacturer describes the requirements for installing a gas boiler in an apartment. For the warranty provided by the manufacturers to be valid, the unit must be installed in accordance with their recommendations.

norms for installing a gas boiler in an apartment

The list of requirements is as follows:

  1. Wall mounted boiler separated from the walls with a non-combustible material. When tiled or covered with a layer of plaster, this will suffice. The appliance must not be immediately hung on a surface lined with wood.
  2. Floor unit placed on a non-combustible base. If the floor has ceramic tiles or concrete, you do not need to do anything. A sheet of heat-insulating material should be placed on the wooden flooring, and a metal sheet should be fixed on top of it, the size of which exceeds the boiler's dimensions by 30 centimeters.

Number of storeys and other requirements for gasification

In accordance with the current SNiP and SP, installation or relocation of a gas boiler in an apartment building is allowed if there is a required area of ​​the room and a reliable chimney system that complies with the rules for the safe operation of gas equipment.

Such equipment is installed only in non-residential rooms: a kitchen or auxiliary rooms with a window, a door and reliable ventilation.

The number of storeys is of great importance for obtaining a permit. Previously, limits were set for the installation of gas boilers from 5 to 9 floors.

Now the norms for installing a gas boiler have been clarified by clause 5.18 of SP 402-1325800 / 18, it is allowed to install an autonomous boiler in residential buildings up to 28 m high.

Requirements for the arrangement of the chimney

When a gas boiler of any type is installed in an apartment of an apartment building, the chimney must not be made narrower than its outlet. If the device has an open combustion chamber and a power not exceeding 30 kW, the chimney cross-section cannot be less than 140 millimeters, and with a capacity of 40 kW - 160 millimeters in diameter.

If the boiler has a closed combustion chamber, it is equipped with a coaxial chimney with a cross-sectional size recommended by the manufacturer.

installation of a gas boiler in an apartment building requirements

Then you need to adhere to these rules:

  • the pipe going up from the wall-mounted gas unit must have a length of at least 50 centimeters, and then only the elbow can be installed;
  • more than three bends must not be created along the entire length of the chimneys;
  • combustion products from appliances with open combustion chambers are removed into the chimney, and with closed ones - also into the chimney or through the wall directly to the street (the method depends on the project).

Requirements for the premises

The room allocated for the installation of a boiler in an apartment of an apartment building must comply with fire and sanitary requirements.

Installation of gas boilers is allowed in non-residential premises, the permissible volume of the room, which has a door and a window.

The wall for placing the boiler must be solid or additionally reinforced so that it can withstand the structure of the unit.

All surfaces adjacent to the boiler must be insulated with heat-resistant material, including the floor and ceiling. The front of the boiler must have a free space of at least 100 cm for its maintenance and repair.

Main characteristics of non-residential premises for boiler installation in accordance with SNiP 42-01 and MDS 41.2-2000:

  • the minimum ceiling height is 2.5 m;
  • window area at the rate of 0.03 m2 per 1m3 of the room volume;
  • the design of the elements of the room must correspond to fire resistance of at least REI 45;
  • the door in the room must have a width of 80 cm and a lower gap of 2 cm;
  • the room must have supply and exhaust ventilation with 3-fold air exchange per hour by the volume of the room, plus an additional volume for burning gas fuel in the boiler.

Best Place to Install

The most suitable room is the kitchen, especially since there is already a gas inlet in it. The minimum area of ​​the furnace for placing a boiler unit with a closed furnace must be at least 4 m2.

If the owner has doubts about the placement of the boiler in an apartment of a multi-storey building, it is necessary to consult with the gas service, which will check the technical capabilities of the existing rooms, especially since this study will be mandatory before issuing technical specifications.

Chimney requirements

Chimney systems and ventilation ensure the safe operation of gas boilers for heating an apartment, therefore special requirements are imposed on them from the gas, fire inspection and SES.

In most cases, the ventilation system of apartments in low-rise buildings is not designed to remove boiler flue gases, therefore, it is preferable to install a gas boiler with a closed combustion chamber with a coaxial gas duct located horizontally with an outlet through the wall.

The advantage of this design is that the air intake will be carried out from outside the premises through the outer pipe of the coaxial system, that is, it will not affect the sanitary and epidemiological quality of the air in the dwelling.

The size of the section of the coaxial chimney is determined by the manufacturer of the boiler and is indicated in the passport of the boiler equipment.

Choosing a gas boiler

Before putting a boiler in an apartment, you need to make the best choice.Wall and floor boilers can be installed in a multi-storey building. Wall models are considered more aesthetic and convenient in terms of placement. Their dimensions are comparable to the dimensions of kitchen wall cabinets and therefore they fit well into the interior of the room.

It will be more difficult with the installation of floor units, since they cannot always be pushed close to the wall. This nuance depends on the location of the smoke exhaust pipe. If it is on top, then the device, if desired, is moved to the wall.

Boilers also come in single and double-circuit. The first of them work only for heat supply, and the second - for heating and water heating. When other equipment is used for DHW, then a single-circuit model will suffice.

permission to install a gas boiler in an apartment

If the water is heated by a gas boiler, then you will have to choose one of two methods: an indirect heating boiler or a flow coil. Both options have disadvantages. When a coil is used, which means that instantaneous heating is carried out, not all units are able to maintain the set temperature.

For this reason, special operating modes must be set in boilers, they are called differently in different devices. For example, in Navien models (read about Navien boiler malfunctions), Beretta is “hot water priority”, and in Ferrolli it is “comfort”.

The disadvantage of boiler heating is that gaseous fuel is consumed to maintain a stable water temperature in the tank. In addition, the reserve of heated water is limited. After its consumption, you have to wait until the new portion heats up.

The choice of the above methods is an individual matter, but you need to remember that with the flow-through version you will have to focus on the productivity of heating water per minute, and with a boiler room - on the volume of the tank.

Gas units differ in the type of burner used, which are:

  • single-position;
  • two-position;
  • modulated.

The cheapest are single-position ones, but at the same time they are the most uneconomical, since they always operate at full capacity. Slightly more economical are two-position ones, which are capable of operating at both 100% power and 50%. The best burners are considered modulating because they have many operating modes, which saves fuel. Their performance is automatically controlled.

is it possible to put a gas boiler in the apartment

The burner is located in a combustion chamber, which can be either open or closed. Oxygen for open chambers comes from the room, and combustion products are removed through an atmospheric chimney.

Closed chambers are equipped with a coaxial chimney structure, and oxygen for combustion enters them from the street. In this case, the combustion products are discharged along the central contour of the chimney, and air enters through the outside.

Floor-standing units are equipped with an inflatable or atmospheric burner. When a floor-standing boiler is installed in an apartment building, it is allowed to use an atmospheric burner in the apartment. Most of these gas appliances have a closed combustion chamber, which means that they are equipped with a turbine and a coaxial chimney.

Calculation of boiler power

When the type of heating unit is selected, you should decide on its power. If desired, you can order a heat engineering calculation that allows you to determine the heat loss in the premises. Based on this figure, they begin to select the boiler power.

It is possible not to make calculations, but to use the norms obtained by experience, according to which 1 kW of boiler power is required for 10 "squares" of the area. This result should be supplemented with a performance margin for various losses.

For example, to supply heat to an apartment with an area of ​​60 "squares", a 6 kW device is needed. If water heating is planned, add 50% and get 9 kW of power, and in case of abnormally cold weather another 20-30%. The final result is 12 kW.

is it possible to install a gas boiler in the apartment

But this is a calculation for central Russia.If the settlement is located to the north, the unit's productivity should be further increased. The specific value depends on the degree of insulation of the house. For a panel or brick high-rise building, this will be 50% or more.

The boiler must have sufficient power to ensure comfort in the apartment, so you should not save on it. The cost difference won't be big. If an automated boiler is purchased, then there will be no overconsumption of gas, since such models of units are the most economical.

The process of obtaining a permit related to whether it is possible to put a gas boiler in an apartment is rather complicated, costly and time-consuming. But all the efforts are worth it, since it is much better to live at a comfortable indoor temperature. At the same time, you will have to pay for individual heating less than for centralized heating.

Boilers

Ovens

Plastic windows