General list of executive documentation drawn up during construction


Certificate of inspection of hidden works download the form and sample filling


free at the end of the article. Consider the rules for drawing up and instructions for registration. The hidden work act is the last stage in assessing their quality and compliance with all norms and standards.

The paper certifies that this stage of construction or repair is completed with high quality, so you can proceed to the next stage. Survey of hidden works is carried out by an authorized commission, which draws up and signs the act. Important points in the preparation of paper: the need to indicate the details of the parties involved (the customer, the company that carries out the construction, the design office), the assignment of the act of the number and the date of drawing up information about the representatives of each party, the presentation of detailed information about the hidden works (name, compliance with the project documentation, what materials were used during construction) the start and end dates of work are indicated, in what quantity the act was drawn up, what documents are attached to it, what notes are there. The act is signed by all authorized persons (surname, initials and signature).

Our advantages:

We DO NOT use low-paid labor migrant workers to get more profit at the expense of quality
We provide a real quote with no hidden costs
We DO NOT create expensive advertising campaigns that the customer ultimately pays for
Our prices on the site are up-to-date: as written, we count!
We guarantee high quality of work
We work without intermediaries
We have low prices!

Certificate of completion of the PVC window

Over time, any equipment becomes obsolete, loses its performance, and needs to be replaced. Dismantling can only be started after the decommissioning process or after a decision has been made to replace the existing equipment with a new one.

FILES Dismantling is no less a responsible process than installation.

In order to produce it, the organization attracts specialists with sufficient experience.

An agreement is concluded on what services and in what volume are provided. And the act of dismantling the equipment is signed after all the work is completed. It is a guarantee that the customer has no complaints against the contractor.

The customer signs that the work prescribed in the text of the document has been completed in full. Among other things, individual units and other elements of the dismantled equipment may still be usable.

Sometimes they contain parts made of precious metals.

How is the act of transferring windows drawn up

After the order for the manufacture and delivery of plastic windows is placed, the customer must accept the products and receive the document in his hands. It should state:

  • The number of the contract, according to which the structures were brought
  • List of all systems, their sizes and colors. The list also includes additional elements
  • Date, signature of the person in charge of the company and seal

You need to sign the act only when you have personally checked all PVC windows, made sure of their integrity and full compliance with the ordered dimensions and design. The doors should be easy to open / close, glass units should not have internal fogging, dirt and scratches, all fittings are in good order.

Plastic windows

The act of hidden works when installing pvc windows

Traces of moisture exposure, fungal infections and destruction of the finishing coatings of window slopes were recorded at the time of the survey (photo 7). Error 9 When examining the junctions of window and balcony blocks to wall structures, it was revealed that during the installation of structures, the technology of the installation of the assembly seam was violated.

The outer layer of the assembly joint must be waterproof when exposed to rain, at a given (calculated) pressure drop between the outer and inner surfaces of the assembly joint. On all products, there is no protection of the assembly seam with waterproofing and self-expanding tapes or mastic materials (photo 8 a, b). On the inside, in the accessible areas, no vapor barrier tape devices have been identified.

Error 2 Passports for window blocks are not submitted by the manufacturer of the work, which is also a violation of GOST 23166-99 "Window blocks. General technical conditions", clause 6.9: "Each batch of products must be accompanied by a quality document (passport), which indicates:

  • name and address of the manufacturer or its trademark;
  • product designation;
  • product certification data;
  • batch (order) number;
  • shipment date
  • number of products in a batch (pcs and m2);
  • specification of component parts;

The quality document must have a sign (stamp) confirming the acceptance of the batch of products by the technical control of the manufacturer.

The quality document indicates the main technical characteristics of the products and the warranty. "

Attention Multiple and massive defects of assembly joints have been identified, which lead to freezing and wetting of assembly joints, window slopes and window structures.

Conclusions based on the results of the inspection of window structures Thus, the installed window and balcony blocks have multiple and massive defects that violate the requirements of GOST 30674-99 "Window blocks from PVC profiles" and GOST 23166-99 "Window blocks.

General technical conditions ". The identified defects are classified as significant, critical and unrecoverable defects.

Significant and critical defects include defects leading to a loss of operational characteristics that cannot be eliminated without replacing a part of the product (breakdown of a profile or window devices, a cracked glass unit, etc.), exceeding the maximum size deviations by more than 1.5 times from those established in the regulatory documentation, understaffing of products. But if you really want to - then by the number of anchors.

murena12 Date: Tuesday, 08.09.2009, 11:32 | Message # 5 Colonel-General Novorossiysk Awards: 49 Group: Verified City: Novorossiysk Messages: 939 Reputation: 102 Status: Offline No volumes are needed for an act for the inspection of hidden works. I post samples of acts for fastening windows, repairing plaster slopes and priming slopes before painting.

Everything in Excel, my production, please use it.

Attachments: 1468914.xls (97.5 Kb) A giraffe is a horse made according to all the requirements of the PC "GRAND-Smeta" customer 8.0.3 Maria_V Date: Thursday, 10.09.2009, 14:58 | Message # 6 Lieutenant Yekaterinburg Awards: 0 Group: Verified City: Yekaterinburg Messages: 61 Reputation: 0 Status: Offline

Info Professionalism is the key to success! Success gives birth to the future! Information and analytical Internet portal www.universal-center.ru is intended for specialists of companies working in the field of window technology and production.

The main activity of LLC "Center for Modern Technologies Universal" is technical consulting and information support for manufacturers of window structures, providing a range of services (recommendations, solutions, procedures) to improve the efficiency of existing or newly created production and the development of the window business.

The range of services provided by CST "Universal" is wide enough and you will surely find the one that will help you and increase the efficiency of your business.

"He who is fond of practice without science is like a helmsman stepping on a ship without a rudder and a compass: he is never sure where he is sailing."

.

The volumes in the acts must be indicated, i.e. how many structures of a certain type have you mounted, how many pm of the window sill, etc. If the volume is not specified, then the act for one window can then be issued for ten.

Money is not evil ... evil does not disappear so quickly cvp Date: Thursday, 10.09.2009, 15:59 | Message # 7 Sergeant Novosibirsk Awards: 0 Group: Verified City: Novosibirsk Posts: 35 Reputation: 1 Status: Offline And there is a GOST for sealing window and door openings slavalit Date: Thursday, 10.09.2009, 17:09 | Message # 8 Engineer-estimator Khabarovsk Awards: 253 Group: Moderators City: Khabarovsk Posts: 7526 Reputation: 248 Status: Offline Maria_V, in acts for hidden work it is necessary to indicate not the volume, but the location. For example: sealing window boxes 2, 3, 4 floors in axes 2-7 / A-D. Well, or something like that ... Portal menu Login form Old login form E-mail: Password: remember Forgot password | Registration Mini-chat Authorization is required to add. Our poll [·····] SHARE Previous articleNext article

Instructions for writing an Act of acceptance and transfer of goods

We will conventionally divide the filling out of the document into three stages.

Information about the parties

The first part of the act contains information about which document it is attached to (application number, date, contract number). Then the full name of the enterprise transferring the goods is entered, indicating the representative official (here usually either the Director, General Director or other authorized employee is written) and the document on the basis of which he works ("Charter", Regulation "," Power of Attorney ", etc.) etc.).

Conditions of acceptance and transfer and list of goods

The second part includes the main points on the transfer of goods.

  • First, the very fact of the transfer is recorded, as well as the document on the basis of which it took place (its name, for example, "Agreement", the number and date of its preparation).
  • Then you need to include a table in the act, in which you enter a detailed list of the transferred goods, indicating the name, quantity, price and total cost.
  • Below the table, you should once again indicate the total cost of the transferred goods (in numbers and in words).
  • Next, you need to make a point about the state of the transferred products. If it is in excellent condition, then this must be noted, but if it has any defects and malfunctions, then this should also be recorded (preferably in a separate document).
  • After that, it is necessary to certify that the receiving party has no complaints about the quality and quantity of the transferred goods.
  • In the next paragraph, it is necessary to note the number of copies of the act, and also note the equivalence before the law.

Executive documentation

1 An example of as-built documentation for the construction of a GPON network, 2 An example of as-built documentation for the laying and installation of fiber-optic lines, 2а An example of as-built documentation for connecting a medical facility to the Internet, 3 An example of as-built documentation for equipping and retrofitting communication nodes with telecommunications equipment, laying a fiber-optic communication line, CCI 4 Example of an executive documentation for connecting a corporate client to the MCCS using P2P technology, 5 Example of as-built documentation for the construction of cable ducts 6 Example of as-built documentation for laying an optical cable into the ground, 7 Example of as-built documentation for the construction of a radio communication line 8 Example of as-built documentation for the construction of an overhead line 0.4 kV overhead line from the TP to the client (for connecting the client to the power grid), 9 Example of as-built documentation for the construction of an overhead line 6 kV overhead line with the installation of a new complete transformer substation KTP and the construction of a 0.4 kV overhead line from the newly installed KTP 10 An exampleof as-built documentation for the construction of an external electric lighting network 11 Example of as-built documentation for the construction of a power supply network 12 Example of as-built documentation for the construction of an intra-house power supply network in an apartment building 13 Example of as-built documentation for electrical installation for a private person 14 Example of as-built documentation for the installation of a central heating unit (CHP) We also recommend familiarize yourself with as well as an interesting section.

Recommended reading: Should a minor owner pay membership fees to

15 An example of as-built documentation for a central heating unit (TsTP) for starting a coolant 16 An example of as-built documentation for the installation of storm sewers 17 An example of as-built documentation for the repair of premises 18 An example of as-built documentation for the device of an irrigation tank and a pumping station 19 Example of as-built documentation for gasification of a residential building, 20 Example of as-built documentation for overhaul of the main gas pipeline MG 21 Example of as-built documentation for medium-pressure gas pipelines to steam boilers at CHPP 22 Example of as-built documentation for the installation of a grounding device, 23 Example of as-built documentation for the installation of a structured cabling system (SCS). ID connection TD WiFi 24 Example of as-built documentation for the installation of an automatic fire alarm system, 25 Example of as-built documentation for low-current systems (electronic queue, ACS, SCS, video surveillance, burglar alarm, warning system), 26 Example of as-built documentation for the construction of a base station of cellular communication BS SS, 27 An example of as-built documentation for the arrangement of an oil field.

Construction of a cluster pumping station at KNS.

28 An example of as-built documentation for the construction of an external utility sewage system. 29 An example of as-built documentation for the construction of an internal water supply and sewerage network 30 An example of as-built documentation for the construction of a temporary construction camp for 460 people during the construction of an oil pumping station and TP for the CPC pipeline (a set of executive documents for the KSKU to close the execution).

31 An example of as-built documentation for the installation of reinforced concrete structures 32 An example of as-built documentation for reinforced concrete structures (industrial fire water supply network) See the composition of the executive in the section: Download acts, protocols and more in the section: Download useful books, GOSTs, SNIPs in the section: “

Survey of hidden works in construction, taking into account all the latest changes: correct filling, a list of hidden works

And even if there is, then it is still quite meager. The main regulatory document for drawing up certificates of inspection of hidden works is. I advise everyone to familiarize yourself with it.

This RD is with changes that came into force on February 28, 2021. This guidance document introduces a new hidden work form.

The form of the form has been approved and you cannot make your own changes to it.

For some reason, all builders are very fond of doing this. On February 15, 2021, changes were made to the RD and on February 28, 2021, these changes entered into force. From this period, the sample of the certificates for the survey of hidden works must fully comply with the new form given in RD 11-02-2006 as amended on 15.02.2018.

There are many examples on the Internet, but unfortunately most of them are designed in the old form. This article will present the correct version of the completed act according to the current requirements.

Also, advice will be given on the design of the act, taking into account the changes in the City Planning Code of July 01, 2021.

РђРєС ‚СЃРєСЂС‹ С‚С ‹С… СЂР ° Р ± РѕС‚ РѕР ± СЂР ° Р · РµС † Р · Р ° РїРѕР »РЅРµРЅРёСЏ

RџSЂRo P "SЋR ± RѕRј SЃS,SЂRѕRoS,RμR" SЊSЃS,RІRμ Röhr "Ryo SЂRμRєRѕRЅSЃS,SЂSѓRєS † RoRo RІS

Рљ тР° РєРѕРІС ‹Рј относят РєР ° Рє СЂР ° Р ± РѕС‚С ‹РІРЅСѓС‚СЂРё Р РР ° РЅРёСЏ, РЅР ° РїСЂРёРѕРРРСРСРСРСРСРСРСРСРСРСРСРСРСССРѕРѕ РРРРѕРїРРРРРРРРРРРРРРРРРРРРРРРїРРРРРРР ° Рє СЂР ° Р ± оты внутЂо Р №СЃС‚РІСѓ РєРѕРјРјСѓРЅРёРєР ° С † РёР№, тР° Рє Рё РІРЅРµС € РЅРёРµ - Р · емляны Рµ.

RџRѕSЃR "Rμ P · P ° RІRμSЂS € RμRЅRoSЏ RјRѕRЅS,R ° ° R¶R RѕRєRѕRЅ, RѕS,RґRμR" RєRo RїRѕR "P ° Ryo SЃS,RμRЅ RїSЂRѕRІRμSЂRoS,SЊ SЃRѕRѕS,RІRμS,SЃS,RІRoRμ SЃRєSЂS

Поэтому проводится своевреRјRµRЅRЅR ° СЏ проверкР°.

РџРѕ ее реР· СѓР »СЊС‚Р ° тР° Рј РѕС„ РѕСЂRјР »СЏРµС‚СС Р ° РєС‚ СЃРєСЂС ‹С‚С‹ С… СЂР ° Р ± РѕС ‚котоРРѕРѕРРРѕС‚РРРѕРѕ СЃРєР ° С З Р ° ть РІ РєРѕРЅС † Рµ стР° тьи.

РџРµСЂРІС ‹Р№ этР° Рї РѕС„ РѕСЂРјР »РµРЅРёСЏ Р ° ктР°

RџRμSЂRμRґ S,RμRј RєR Rє RіRѕS,RѕRІRoS,SЃSЏ ° C "RѕSЂRјR ° RґR" SЏ P · P ° RїRѕR "RЅRμRЅRoSЏ, RїSЂRѕRІRѕRґRoS,SЃSЏ RѕSЃRјRѕS,SЂ RІS

RџSЂRѕRІRμSЂSЏRμS,SЃSЏ Roes ... C ‡ RμS,RєRѕRμ SЃRѕRѕS,RІRμS,SЃS,RІRoRμ RїSЂRѕRμRєS,RЅRѕR№ RґRѕRєSѓRјRμRЅS,R ° C † RoRo Ryo SЃS,SЂRѕRoS,RμR "SЊRЅS

RћS, RіSЂR ° RјRѕS,RЅRѕSЃS,Ro RѕRїRμSЂR ° C RoR№ RІRЅSѓS,SЂRo † P · RґR ° RЅRoSЏ - RїRѕ RїSЂRѕRєR "P ° RґRєRμ RїSЂRѕRІRѕRґR ° Ryo RїSЂRѕS ‡ ... Roes RєRѕRјRјSѓRЅRoRєR ° C † RoR№ - P · ° F RІRoSЃRoS, Р ± еР· РѕРїР ° сность СЌРєСЃРїР »СѓР ° тР° С † РёРё.

РџРѕСЃР "Рµ Р Р Р ° РІРµСЂС € ения отдеР" РєРё РїРѕР "Р ° Рё стен, монтР° жР° окоРоРвтРвРРѕРІРІРІРІРѕРІРІРІРІРІРІРРІРѕРІРІРРРРввееРнельР· СЏ. R'RјRµSЃS‚Rµ СЃ теRј треР± уетСС СЃРѕРѕС‚РІРµС‚СЃС‚РІРёРµ всем РЅРѕСЂРјР ° тивР° Рј.

РћС † енивР° ются СЃСЂРµРРё РїСЂРѕС ‡ РёС… СЃР »РµRґSѓSЋС ‰ РёРµ РїР ° СЂР ° метры:

  • соответствие треР± РѕРІР ° РЅРёСЏРј Рє РїСЂРѕРєР »Р ° РґРєРµ РїСЂРѕРІРѕРР °;
  • СЃС‚С ‹РєРё трСР ±;
  • СЃРІР ° СЂРѕС ‡ РЅС ‹Рµ С € РІС‹;
  • РіРёРґСЂРѕРёР · РѕР »СЏС † РёСЏ;
  • вентиР"СЏС † РёСЏ;
  • тепР"РѕРёР · РѕР" СЏС † РёСЏ;
  • СѓСЃРёР »РёРІР ° СЋС ‰ РёРµ СЂР ° РјС‹.

Р'Р ° жно! RђRєS, RїRѕRґS,RІRμSЂR¶RґR ° RμS, C ‡ ‡ S,Rѕ RІRμSЃSЊ RїRμSЂRμS RμRЅSЊ RѕRїRμSЂR ° C RoR№ RІRЅSѓS,SЂRo † P · RґR ° RЅRoSЏ RІS

RћSЃRјRѕS,SЂ, RєR Rє SЃRґRμR ° "° P ° RЅR RіRoRґSЂRѕRoR · RѕR" SЏS † RoSЏ Ryo RїRѕRґRІRμRґRμRЅS

Р "отовР° СЏ отдеР" РєР ° РЅРµ РїРѕР · РІРѕР "РёС‚ РѕС † РµРЅРёС‚С СЂРµР · СѓР "ьтР° ты.

P 'RїSЂRѕS,RoRІRЅRѕRј SЃR "SѓS ‡ ° F Rμ RїSЂRoRμRјRЅR ° SЏ RєRѕRјRoSЃSЃRoSЏ RјRѕR¶RμS, RїRѕS,SЂRμR ° ± RѕRІR S,SЊ RґRμRјRѕRЅS,RoSЂRѕRІR S,SЊ ° C € S,SѓRєR ° S,SѓSЂRєSѓ SЃS,RμRЅ Ryo RґSЂSѓRіRoRμ отдеР»РѕС ‡ РЅС‹ Рµ РјР ° териР° Р »С‹, препСС‚СС‚РІСѓСЋС РёРµ проверке.

РљРѕРіРґР ° Р ° РєС ‚СЃРєСЂС‹ С‚С ‹С… СЂР ° Р ± РѕС‚ Р · Р ° РїРѕР »РЅРµРЅ, РѕРЅ РЅР ° СЂСЏРґСѓ СЃ РїСЂРѕРѕ ‡ РёРјРё РѕРѕРРѕРѕ РёРјРё РѕРСРС РЅРµRЅRЅС ‹С… РґРµR№СЃС‚РІРёСЏС… передР° етСС РїСЂРёРµРјРЅРѕР№ РєРѕРјРёСЃСЃРёРё. ФорRјR ° РґР »СЏ СЃРєР ° С З РёРІР ° РЅРёСЏ РЅР ° С… РѕРґРёС‚СС РІ РєРѕРЅС † Рµ стР° тьи.

P '° SЃRѕSЃS,R PI RєRѕRјRoSЃSЃRoRo RІS ... RѕRґSЏS, SѓRїRѕR "RЅRѕRјRѕS ‡ RμRЅRЅS

Р Рј же Р ± СѓРґСѓС ‚предоЃС‚Р ° РІР» яться РґР ° РЅРЅС ‹Рµ Рѕ РІС‹ РїРѕР »РЅРµРЅРёРё РїСЂРѕРІРµРРѕРРѕРїРѕРІРѕРѕРѕРРІРРІРѕРІРѕ РѕРРІРРІРРРРРРРРРїРѕ °, стен, монтР° же РѕРєРѕРЅ.

Что РґРѕР "жен содержР° ть Р ± Р" Р ° РЅРє

РћС „РѕСЂРјР" ение документР° РїСЂРѕРР · РІРѕРґРёС‚СС РїРѕ Р "11.2006. Р 'стР° РЅРґР ° С' РЅС ‹Р№ Р ± Р» Р ° РЅРє, СЃРєР ° С ‡ Р ° тт РєРѕС‚РѕСЂС ‹Р№ РјРѕРѕРЅРѕ РґР ° Р» ее, РІ РѕР ± С ±Р · Р ° теР"СЊРЅРѕРј РїРѕСЂСЏРґРєРµ вносятся:

  1. РќР ° Р · РІР ° РЅРёРµ СЃРєСЂС ‹С‚С‹ С… СЂР ° Р ± РѕС ‚(РіРёРґСЂРѕРёР · РѕР» СЏС † РёСЏ, Р · емляны Рµ СЂР ° Р ± РѕСС.
  2. РџРѕРґСЂРѕР ± РЅРѕРµ РѕРїРёСЃР ° РЅРёРµ СЃ РїСЂРѕРјРµР¶СѓС‚РѕС З РЅС ‹РјРё оперР° С † РёСЏРјРё.
  3. Адрес РѕР ± ъектР°, РЅР ° котором РїСЂРѕРІРѕРРёР »СЃСЏ ремонт РёР »Рё монтР° Р¶.
  4. R "R ° тР° РїРѕРґРїРёСЃР ° РЅРёСЏ, место.
  5. Р¤.R .Rћ СЃРѕС‚СРґРЅРёРєРѕРІ, СѓС ‡ Р ° ствовР° РІС € РёС… РІ РІС ‹РїРѕР» нении монтР° жР°.
  6. РџРѕРґРїРёСЃРё сотрСРґРЅРРРѕРІ Ryo R "РёС † Р °, ответттвенного Р · Р ° приемкС.

РџРѕРјРёРјРѕ РѕР ± СЏР · Р ° тельны С… сведеRЅRёR№ РїРѕ Р ”11.2006 Рі, РІ РѕР ± СЂР ° Р РјРѕРјРµРЅС‚С ‹:

  • РёСЃРїРѕР »СЊР · РѕРІР ° РЅРЅС‹ Рµ РјР ° териР° Р »С‹;
  • РїРµСЂРµС ‡ ень Р · Р ° действовР° РЅРЅС ‹С… РєРѕRЅSЃС‚СЂСРєС † РёР№.

Р'Р ° жно! РљРѕРіРґР ° РѕР ± РЅР ° руживР° СЋС‚SЃSЏ серьеR · РЅС ‹Рµ РЅРµРґРѕС ‡ еты, отвеСттвРРѕРРСС‚СтвРРѕРРРтттвРРРѕРРРтттвРРѕРРРтттвРРРѕРРРтттвРРѕРРРтттвРРѕРРРС‚СтвРРѕРµРРРРµС‚С‚С‚С ‹, отвеСттвжРРІР ° СС‚СС СЃРµРЂРµR РёС… РёСЃРїСЂР ° РІР »РµРЅРёСЏ Рё повторного Р · Р ° РїРѕР» нения Р ° ктР°.

РљР ° ждР° СЏ РѕСЂРіР ° РЅРёР · Р ° С † РёСЏ РІРїСЂР ° РІРµ СЃР ° мостоятельно СЂR ° Р Р ° 2021 РіРѕРґР °, РІР · СЏРІ Р · Р ° РѕСЃРЅРѕРІСѓ РѕС „РѕСЂРјР» ение Р Р ”РѕС‚ 02.11.2006. РћС‚RґRµR "СЊРЅРѕРіРѕ РґРѕРєСѓРентР° может потреР± РѕРІР ° ть РіРёРґСЂРѕРёР · РѕР »СЏС † РёСЏ.

РћРґРЅР ° РєРѕ Р ± Р »Р ° РЅРє РґРѕР» жен содерR¶R ° ть РІСЃРµ РІС ‹С € еупомянутРСРРЅС‚РС СРРЅРѕР» жен содержР° С‚С РІСЃРµ РІС ‹С € еупомянСС‹ РСРРРРѕР РІРРРеви РІРЂРРРµРРІРРРёРРµ веРвРРРееве РІРРРРµP

R "RѕRїRѕR" RЅRoS,RμR "SЊRЅRѕ Rє ° F RєS,Sѓ RїRѕ RїSЂRѕRєR" RґRєRμ RїSЂRѕRІRѕRґR ° F ° C ° Ryo RєRѕRјRјSѓRЅRoRєR † RoR№ SЃRѕSЃS,R ° RІR "SЏRμS,SЃSЏ RoSЃRїRѕR" RЅRoS,RμR "SЊRЅR ° SЏ SЃS ... емР°, РѕС „РѕЂРјР» ение котоой отрР° жР° РµС ‚РѕР ± ъем проведРРµРРЅС‹ С… СЂСР ° Р ±

The construction pricing reform should have been completed 966 days ago.

Share pliz, an act for hidden work when installing PVC windows.

Well, or rather a list of these works! As I understand it, this is foam filling?

surface preparation for slopes? how these works are correctly called and how to calculate their volume.

After all, these works are taken into account in! Shtirlits, IMHO, hidden works when installing PVC windows are only fastening window blocks and sealing window boxes.

I guess! Thanks for the correct names of the works. Here's another way to understand how to calculate their volumes correctly. The sealing can be calculated along the perimeter of the windows. And the fastening of window frames, in my opinion, does not apply to hidden work.

But if you really want to - then by the number of anchors. For an act for the survey of hidden works, volumes are not needed. I post samples of acts for fastening windows, repairing plaster slopes and priming slopes before painting. Everything in Excel, my production, please use it. We drew up acts according to the form attached by murena12, The work is as follows: window installation (incl.

fastening with anchor plates, filling the joints with foam and gluing the insulation inside and outside), installation of a window sill, installation of slopes or their plaster.

The acts listed all the materials that were used, indicated the relevant certificates and attached them, and also attached installation diagrams. The volumes in the acts must be indicated, i.e. how many structures of a certain type have you mounted, how many pm of the window sill, etc.

If the volume is not indicated, then the act for one window can then be issued for ten. And there is a GOST for sealing window and door openings Maria_V, in acts for hidden work, it is necessary to indicate not the volume, but the location. For example: sealing window frames 2, 3, 4 floors in axes 2-7 / A-D. Well, or something like this .cvp, GOST 30971-2002

"SEAMS OF ASSEMBLY UNITS JOINING WINDOW UNITS TO WALL OPENINGS"

Or do you need brickwork?

cvp, GOST 30971-2002 (for the installation of windows) Download for health (free) Maria_V, acts for hidden work are drawn up in accordance with the work log, and there it is specifically spelled out: how many windows were installed, when and where (rooms or along the axes of the facades) I agree , we did so, but additionally we also prescribed the volume in the act or the installation scheme, it did not bother anyone, and the Customer liked it that way.

Do-it-yourself installation of plastic windows: installation in accordance with GOST

Before starting installation work, it is necessary to completely free the window opening and the space next to it:

  • remove everything from the windowsill,
  • remove the curtains,
  • clear the approach to the window by moving the furniture at least 1.5 meters away from the window.

Protect the room from dust and dirt by covering the floor and furniture with cloth or thick oilcloth.

For ease of installation, connect the 220V power supply through an extension cord, prepare garbage bags.

Dismantling the old frame

After the room is ready for the appearance of dust and debris, they begin to dismantle the old window frame.

The sash is removed from the window. Dismantle window frames. If necessary, dismantle (knock off) the slopes.

The old window frame is dismantled, and, as a rule, it is seriously damaged. If you want to use old windows, for example, in the country house, you should stipulate the option of keeping old windows when ordering.

The old ebb, the old window sill is being dismantled.

PVC window installation

The sashes are removed from the plastic window, the double-glazed window is removed. A window frame is inserted into the prepared opening and fixed on anchor bolts or mounting plates.

In this case, it should be strictly observed that the frame is level, and not along the opening (in houses there are often cases when the horizon line of the window opening is far from ideal, the frame should also be level vertically).

Otherwise, the window will not function properly.

The gaps between the wall and the frame are foamed with polyurethane foam. The foam serves both as an insulating function and as a fastening element. The overall result largely depends on the quality of this stage of installation. The foam should be applied evenly and fill all recesses and cavities in the opening, taking into account the expansion rate of the foam.

The installation of a plastic window in most cases means that a new window sill and a new ebb will be installed along with the new window. An exception is the case when repair work is underway in the apartment (house, room) and the window sill can be installed on its own.

If the window to be mounted opens onto the balcony (as in this case), then it is quite expedient and functional to install a window sill instead of an ebb (from the outside of the window).

If you have a good old ebb tide, then you can save it for a new window, but in this case it will need to be restored (restored) - a paid service, the cost of which is slightly different from the cost of a new ebb tide.

The window sill is cut out under the opening and attached to the window (to the support profile). If the opening under the windowsill is small, then it foams. Otherwise, it is necessary to masonry or seal the opening with mortar. When installing a window sill (window sill), control that it has a slope from the window within 5 degrees, and the overhang beyond the inner surface of the wall is no more than 60 mm.

When installing the window sill, it should be taken into account that its edges go beyond the finishing of the inner slope to a depth of at least 15-20 mm.

Advice:

when choosing the width (depth) of the window sill, it should be borne in mind that the window sill is "recessed" by 2 cm under the window frame, therefore the width of the installed window sill will be 2 cm less)

All gaps between the window and the opening are filled with foam, and after it dries, they are isolated. The outer layer of insulation is designed to protect the insulation layer (which is the foam layer) from moisture penetration into it, as well as from destructive sun exposure.

So, the main part of the work is finished. However, for the finishing of the opening, there are not enough slopes (which are both a decorative addition, under which you can hide the mounting foam, and a functional element that increases the thermal insulation and sound insulation of the window opening). Plastic slopes will give the window a finished look, moreover, it is the best combination with plastic windows.

Installation of plastic slopes

Plastic slopes are installed on the same day with a window for panel and block houses and on the second day for Stalinist houses.

Either a Belgian sandwich panel (in the picture) or German VEKA plastic slopes with removable platbands are used as slopes.

The differences between the various plastic slopes are not significant, but you should be aware of them.

The Belgian sandwich panel can be installed at dawn (not at right angles to the window), which visually enlarges the window opening. The choice of VEKA plastic slopes is justified for more accurate gluing of wallpaper with already installed slopes. Thanks to the removable casing, the edges of the wallpaper will be neatly hidden underneath.

Advice:

if you have a renovation in your apartment, then it is better to install the trims on the slopes from the Belgian sandwich panel after gluing the wallpaper yourself - it will turn out neater and prettier).

Installing accessories on windows

At the final stage, a double-glazed window is installed in the window frame and the sashes are hung. Installation of additional accessories, fastening of additional fittings and components, such as: a stepped ventilator, a retainer, a mosquito net, blinds, etc.

The window is ready. Upon completion of all work, an acceptance certificate is signed. In it, if necessary, the customer indicates his comments on the work performed, if any.

Almost immediately after completing all the work, the PVC window can be used. The exception is windows with large opening sashes, which are not recommended to be opened within 24 hours after the installation of the PVC window.

In terms of functionality, a plastic window is much better than old wooden windows. If you follow the simple instructions for its care and use, it will serve you forever.

Advice:

remember to remove the protective film from the installed window. The adhesive base of the protective film loses its properties with prolonged heat exposure and can spoil the aesthetic appearance of the plastic profile. In the picture: the protective film has only been removed from the window frame, the film has not been removed from the window sash.

General requirements for installation in accordance with GOST

GOST 30971-2002 “Seams of assembly units for joining window blocks to wall openings. General technical conditions ”was put into effect by the order of the State Construction Committee of the Russian Federation from 01.03.2003.

Source: https://oknabm.ru/about/articles/ustanovka-plastikovykh-okon-montazh-po-gost/

Certificate of Survey of Hidden Works

30328 Some works cannot be verified after construction is completed.

We worked with such objects in which projects were either reconciled 1000 times or they were not there, there was no question of keeping journals by the General Contractor at all. So, comrades, everyone has their own truth!

This applies to work carried out inside building structures and communications, for example

  • installation of reinforcement in concrete walls,
  • priming the surface before painting,
  • the thickness of the sand substrate under the paving stones,
  • laying pipes before backfilling with soil,
  • hydro-, sound-, thermal insulation, etc.

Such "intermediate" works are called hidden and they cannot be seen with the eyes after the completion of construction, therefore, to confirm their quality, special acts are drawn up immediately after their completion.

The mechanism of this check is as follows: before the closure of structures or communications, a specially created commission checks the quality of the work performed and the materials used, and then signs an act for hidden work. FILES It should be noted that such work usually ensures the safety during the operation of buildings and structures, therefore, control over them should be carried out especially carefully.

Finished construction projects may not be put into operation if there are no acts of hidden work in the documentation.

In cases where, for any reason, this act is not drawn up in a timely manner, representatives of the inspecting authorities, just like the representatives of the customer, may demand the elimination of this violation by selective or complete opening of structures or communications and even alteration of the work performed. This document does not have a unified, uniform form for all, so it can be drawn up according to a template developed and approved within the enterprise or in a free form. Main conditions: the act must contain information about the contractor carrying out the work, information about all members of the inspection-receiving commission, the name of the work, as well as the conclusions of the commission about their quality and compliance with building codes and regulations.

We recommend reading: What is the punishment for driving on rails in the same direction

Typically, the commission includes representatives of the general contractor, subcontracting companies, field supervision of the design organization, as well as technical supervision of the customer. The act is drawn up on an A4 sheet in several copies - one for each of the interested parties and each copy must be certified by all members of the selection committee.

It is not necessary to certify the document with seals, since legal entities from 2021 have the right not to use seals and stamps, but it should be borne in mind that in case of disagreement and appeal to the court, the judge may require the presence of an imprint on the document. If necessary, other documents may be attached to the act, as well as photographs indicating that the stage of production of hidden works was performed with high quality or poor quality (depending on the situation). From the point of view of office work, this act is quite standard and should not cause great difficulties when filling it out.

  1. In the first part of the document, its name is written and the essence is briefly indicated (in this case, the "act of hidden works"), and the city in which it is drawn up and the date are indicated: day, month (in words), year. Then the exact designation of the internal work performed is entered. If there are several of them, it is better to enter them point by point, and not separated by commas.
  2. Next, you need to indicate the name of the construction site, as well as its address.
  3. The following lines contain the composition of the commission. Here you need to indicate the organization that this or that person represents, as well as his position, surname, name, patronymic.
  4. The next part of the act includes fixing the fact of inspection of the hidden work performed by the contractor. Here, in separate paragraphs, the name of the work, the developer of the project and information about the order (date, number), the materials used, as well as the date of the beginning and end of the work are indicated.
  5. The final part of the act includes the decision of the selection committee. Here it is necessary to indicate that the work performed meets all established norms, standards and rules, which means that further work on the above object is allowed. The act must be certified by their signatures by all members of the commission.

After the commission carries out full control and establishes that everything has been done with high quality and in accordance with existing standards, the builders can proceed to further work. If, in the process of checking, it turns out that the work was done poorly or that low-quality materials were used, etc., then the identified shortcomings will have to be eliminated at the expense of the contractor.

Before installation

Window blocks are usually delivered to the address a few days before installation. The buyer's task is to carefully inspect the structure for defects.

What should you pay attention to?

  • for the absence of external defects on the profile. Especially carefully you need to inspect the places where there is visible damage to the protective film;
  • on the quality of welded seams on plastic. High-quality seams are smoothed flush with the profile level or look like a small groove (no more than 5 mm in width and 1 mm in depth);
  • on the integrity of the glass unit structure, the absence of traces of moisture, dirt, spreading sealant inside it. You should also make sure that the number of glasses is correct: two glasses are installed in a single-chamber glass unit, three glasses are installed in a two-chamber glass unit;
  • for the compliance of windows with the configuration specified in the contract.

Do not postpone checking until the last moment. When the installers come, there will be no time left for a thorough inspection.

We will answer all your questions!

The vehicle acceptance certificate is required in case of acceptance of equipment from one person to another. An appendix is ​​drawn up to a lease or purchase agreement between two individuals, a service and a customer. What should be in a single act, approved by law, there is no sample. The document is drawn up in free form, but it is necessary to indicate the following information in it: the name of the application; the basis for its preparation; a place […]

In order for the certificate of inspection of hidden works to be correctly completed, indicate the name of the operations performed, the place and date of signing, the details of the parties. As an attachment, the form may contain a list of materials and structures used. A sample for 2021 can be downloaded at the end of the article. The procedure for filling out the form The document is drawn up after the acceptance of the operations performed by authorized persons. The quality must meet building regulations. For example, […]

In most cases, after successful cooperation with the contractor, there is a need to confirm the provision of certain work duties and payment, which complies with the legislation of the Russian Federation. At the same time, carrying out the final legal procedure involves taking into account numerous nuances. Termination Act The Act of Completion to the Service Agreement is one of the most important documents for most businesses. Without registration of this [...]

With any construction or reconstruction, a list of operations is performed, which are called hidden. These include both work inside the building, for example, laying wires and arranging communications, and external ones - earthen. After the installation of windows, flooring and walls is completed, it will be laborious to check the compliance of hidden works with building codes. Therefore, a timely check is carried out. Based on its results, an act is drawn up [...]

Is it important or not necessary When making a transaction in 2021 for the primary (from the developer) or secondary (apartment owner) purchase and sale of real estate, it is necessary to collect the main package of documents, each of which is mandatory and extremely important. And among this set of official papers, the list of which and samples have not changed recently, for some inexplicable reason, the act of acceptance and transfer of an apartment upon sale [...]

An act of acceptance and transfer of fixed assets drawn up according to generally accepted standards must always be present when performing such operations: Sale; Rent; Property exchange, etc.Such an invoice is necessary for the correct acceptance and reflection of fixed assets in the relevant documentation for accounting. The document is required to accompany the procedure for the sale and purchase, exchange, gratuitous transfer, lease of property or real estate. Based on such a certificate [...]

For the procedure for transferring property with the participation of at least two legal entities, a simple consignment note is almost always sufficient. From time to time, the specifics of a specific delivery necessitate the issuance of special transfer documents confirming the process of transporting property, its value in monetary terms, as well as the state after unloading and loading operations. In such situations, an act of acceptance and transfer of goods is drawn up free of charge for permanent storage or [...]

In the process of work and interaction between legal entities, an act of acceptance or transfer of goods and materials when changing a materially responsible person is necessary for each operation to transport property from one organization to another. If the transaction is carried out between separate structures of the same institution, a simple form for internal transfer is drawn up. To register the purchase and sale procedure, it is necessary to draw up a sample [...]

The form of the equipment acceptance certificate, which can be downloaded by following the link indicated at the end of this article, is usually filled out with the participation of at least two parties. To fill out the necessary documentation, a unified form is provided, which can be downloaded as a Word or Excel document. What is the act The reason for the transportation of equipment, for which it is necessary to draw up the relevant documents, may be as follows: [...]

A deed of transfer during the reorganization of enterprises (hereinafter PA) is a document reflecting the rules for the transfer of rights and obligations from one legal entity to another. Reorganization of an enterprise can be carried out in five forms: affiliation; discharge; separation; mergers; transformation. Registration of a set of documents during reorganization still raises questions from the side of reorganized organizations, including the need and content [...]

In most cases, the transfer of goods is accompanied by only one document - a consignment note, but sometimes the terms of the contract between the parties require the preparation of additional paper: an act of acceptance and transfer of goods.

Files

The act serves as a certificate of the fact of movement of material values, fixes their value, as well as parameters such as quality and quantity.

In situations where the recipient makes claims against the supplier regarding the volume, composition, or physical condition (marriage, defects, malfunctions, etc.) of the goods, this document is included in the evidentiary base. Very often, this paper is for the judge (in the event that the disagreements led to the court) a decisive argument for making an appropriate decision.

It is worth noting that certain types of products are transferred only subject to the execution of an act of acceptance and transfer of goods (for example, high-tech equipment, machinery, etc.). This is due to the fact that when such goods are transferred, they are obligatory checked, inspected, etc. procedures.

Another case when the drawing up of an act of acceptance and transfer of goods is inevitable is sending it for safekeeping. Here, an act is created in order to record the appearance, condition, technical characteristics of the transferred material values, as well as designate the conditions for their storage and appoint an employee responsible for the safety.

Acts of completed work

This type of service includes: installation / dismantling of plumbing, installation of underfloor heating, adjustment and connection of finished equipment (water treatment system, water heater, high pressure station), connection of a washing machine and much more - all this is included in the list of plumbing services. and the basis for payment, which you can download free of charge from the link below. The act of completed design work sample Design is not always carried out by large institutes such as Yuzhniigiprogaz.

For example, the design of a fire alarm or ventilation systems for a small store is performed by a small company that has the appropriate approvals and licenses. Download a sample of the work performed from the link below. This act is executed in a tripartite form, because in case of an error revealed at the installation stage, it is possible to determine which of the designers made it.

Repair of cottages in Shchelkovo

We can become a reliable ally for you when performing construction and repair work of any degree of complexity, we are ready to help you with any kind apartment renovation, installation of windows, mosquito nets, finishing works of loggias and balconies. The high professionalism of the craftsmen will allow you to enjoy the comfort and coziness in your own home. Repair is a complex undertaking that can take a lot of your time, but you want everything to be done at a high level? We provide a whole range of repair and construction services, here are some of them: